Home › Who It's For › Solar installers
For solar installers
The Roof, the Array, the Disconnect, On the Real Lot.
A solar permit package starts with a site plan: the house on the lot, the roof faces the panels go on, and the locations of the inverter, the AC disconnect, the meter and the point of interconnection. Ground mounts add setbacks to the property lines. PlotForge™ loads the recorded lot from the address, drops the house on it, draws the roof's hips, ridges and valleys in one click, and you mark the equipment with pointer notes. A to-scale PDF and a PNG for the portal in minutes.
What does a site plan for a solar permit need to show?
A solar permit site plan shows the property lines with dimensions, the house drawn to scale with its roof planes, the roof faces where the modules are installed, and the locations of the inverter, the AC disconnect, the utility meter and the main panel. A ground-mounted array is drawn at its size with its distances to the property lines. North is shown so the orientation reads.
What the plan reviewer looks for on a solar site plan
The electrical plans are separate; the site plan answers where. The building department and the utility both read it, and they look for the same handful of things:
How a solar installer draws the permit site plan
Type the address
The recorded lot loads to scale on the aerial with the owner and parcel number filled in.
Add the house and the roof
One click places the house from records; one more draws the roof lines from the outline. Split the roof for a lower garage or porch.
Mark the array and the equipment
Label the roof faces that carry modules and drop pointer notes for the inverter, disconnect, meter and panel.
Export
The to-scale PDF with north arrow and title block, or a PNG for a permit portal that wants an image. Attach the electrical one-line as its own sheet.
The tools solar installers use
Which plan fits a solar installer
Installs every week
Contractor, $199/mo
Twenty permit-ready plans a month, every job saved in your account, the title block filled automatically. Higher-volume plans include team seats for the design desk and the crew; ask us.
A few systems a month
Job Pack, 12 plans for $144
Twelve clean exports at $12 a plan, no subscription, credits that never expire. Compare plans.
Your brand on the sheet
White-Label add-on
Your company logo in the title block of every sheet in place of ours, +$50/mo with Contractor. See White-Label.
Solar installers FAQ
Related trades
Draw the solar permit site plan in minutes
Load the lot, add the house and the roof lines, mark the equipment, export. Free for 30 days, no credit card required; a clean, permit-ready export is $29.