Home › Who It's For › LIHTC and affordable housing developers
For LIHTC and affordable housing developers
The Application Site Plan, With the Unit Count on It.
A tax-credit application needs a concept site plan long before a civil engineer is under contract: the site, the buildings with their unit counts, the parking with accessible stalls, and evidence that the land is not in a floodplain or a wetland. PlotForge™ loads the parcel from the address, screens it with a one-click Site Feasibility Report, and lets you drop labeled building pads with stories × units, fill the parking court, and print the unit count, the coverage and the stall summary on a branded sheet in minutes.
What does a concept site plan for a LIHTC application need to show?
A concept site plan for a tax-credit or affordable housing application shows the site with its property lines, the proposed buildings as labeled pads with stories and unit counts, the parking with accessible stalls counted, the access from the street, and the site constraints such as flood zone and wetlands. PlotForge™ draws it on the recorded parcel and totals the units, the coverage and the stalls on the sheet.
What the application reviewer looks for on the site exhibit
Scoring criteria differ by state agency, but the site exhibit is asked to prove the same things: the site holds the proposed unit count, the parking works, and the land is buildable. One sheet from PlotForge™ covers the list:
How an affordable housing developer draws the concept
Load and screen
Type the address or parcel ID, merge any adjoining parcels, and run the Site Feasibility Report for flood, wetlands, soils and slope.
Pad the buildings
Drop labeled building pads with stories and units per floor. The unit count prints on each pad and totals across the site.
Park it
Trace the parking court and fill it. Accessible stalls place themselves and count; adjust the angle and read the new total.
Export the exhibit
The branded PDF with the cover sheet for the application, and the DXF for the civil engineer when the deal is awarded.
The tools affordable housing developers use
Which plan fits an affordable housing developer
Applications every round
Contractor, $199/mo
Twenty concept plans or feasibility reports a month, every site saved, the DXF for the engineer after the award. Higher-volume plans include team seats for the development team; ask us.
A few sites a year
Studio, $29/mo
Save every site study in your account, share plan files with the architect, and buy plan credits when an exhibit is due. See Studio.
The firm's name on the exhibit
White-Label add-on
Your logo in the title block of every sheet and report, +$50/mo with Contractor or +$100/mo with Studio. See White-Label.
LIHTC and affordable housing developers FAQ
Related trades
Draw the application site plan in minutes
Load the site, screen it, pad the buildings with their units, fill the parking, export the exhibit. Free for 30 days, no credit card required; a clean export or a report is one plan credit from $29.